Skip to content

Plan cleaning and maintenance ​

In the workspace service planner, the Gantt view shows cleaning in blue and maintenance in yellow. In day and week view, each icon counts nearby assignments of that kind for one unit. Select a single assignment to open its order directly. A count of two or more opens a list of names and exact times. Select an assignment to open its order, or select Open hour view to see individual visits. This plan shows scheduled work only.

Switch to days or weeks to place today at the left edge of the timeline. Switch to hours to start at the current time.

View the plan fullscreen ​

Select Enter fullscreen to the right of the column slider to open the plan in a nearly full-window dialog. A narrow margin remains visible, with the page behind it dimmed and slightly blurred. Select Exit fullscreen or press Escape to return. Your current view is retained.

Displaying more entries ​

In person and team selection, search by name and use Load more to display additional entries. Members of displayed teams remain identifiable even when outside the current search results.

Before you start ​

Create the people, any service teams and the units first. You need planning permissions. An assignment can also be planned without control permissions.

Plan an assignment ​

Open the location and its service-planning tab. Click the desired card under Teams or People. The order dialog opens directly with that recipient selected. A sole active unit is preselected; otherwise choose the intended unit. Choose the assignment type and a clear name. Select people or teams, units and time windows. Add only the control permissions needed and save after review. For booking-linked cleaning, alternatively start planning under cleaning and maintenance in the reservation.

Moving through the calendar loads assignments for the displayed period. The assignment list below the calendar also refers to that period.

Review changes ​

Linked cleaning can move with the booking according to the selected policy. Conflicts may require review and suspend permissions. Fully cancelling a booking ends its linked cleaning. Independent maintenance remains a separate assignment.

Planning limits ​

An assignment does not create an occupancy block. Working hours and travel times are not scheduled automatically. Check people, times and order status in the overview; a saved plan does not confirm completed cleaning.

Related: Reservations, people, team management, devices and controls.

Compact overview and grouped service assignments ​

Site service planning starts with compact rows in day view. Nearby assignments within a unit are grouped by kind. Cleaning and maintenance each have their own numbered marker when space is limited. Zooming in restores individual bars when enough space is available. This also works in hour and week views.

Select a number to see the loaded assignments and their exact times. Selecting an entry opens the existing editing dialog. The number counts loaded entries; it does not indicate that the entire interval is occupied.